§ 123-49. Utilities.  


Latest version.
  • The widths and locations of easements and rights-of-way shall be determined by the Township Engineer for all utilities, including stormwater facilities, and shall be governed by the additional requirements of the Township's Engineering Standards, and the following:
    A. 
    All underground facilities within street rights-of-way shall be installed prior to street paving at locations approved by the Township Engineer for the full width of the right-of-way.
    B. 
    The arrangement for all service connections or laterals shall be the responsibility of the subdivider, developer or builder and shall be installed at the expense of the applicant or subdivider.
    Editor's Note: See , Engineering Standards, included at the end of this chapter.